Thrusting continues and backup framing camera tested
Fri Feb 29, 2008 at 23:59 UTC
Dawn continued ion thrusting through most of February. On February 21 and 22, the backup framing camera was put through a series of tests to demonstrate its performance. The camera successfully completed all the steps, and analysis shows the instrument is healthy and operating as expected.

